Muthu*Creatives

Web design agency · Houston, TX

We buildsites thatconvert.

Custom websites, web apps and automations for businesses that want their site doing real work. Everything coded from scratch. Nothing from a template.

See the work

Free 20-minute call. Fixed quote in writing. Hands-on from day one.

Proof

The work does the talking.

All six projects →

SaaS · Workflow automation

Flowline

A landing page for a workflow automation SaaS. Technical product, plain-English pitch, one call to action.

from kickoff to live
0 hrs
single conversion goal
0 CTA
load time on 4G
<0s
Read the case study
Flowline SaaS landing page hero built by Muthu Creatives, with a bold serif headline, a single call to action and review proof

Salon · Local business

Maison Lumière

A salon site elegant enough to match the chairs, and smart enough to take bookings at 2am.

booking, up from phone hours
0/7
from any page to booked
0 taps
of services indexable
0%
Read the case study
Maison Lumière salon website built by Muthu Creatives, with an elegant serif hero and booking call to action next to salon photography

Restaurant · Local business

Ember & Rye

A restaurant site built around the only two things diners do online: read the menu, book a table.

from any page to a reservation
0 tap
the menu is real HTML
0 PDFs
mobile load on 4G
<0s
Read the case study
Ember & Rye restaurant website built by Muthu Creatives, with a dark photography-led hero and a reservation call to action

Plus Apex Analytics, FlowForge, Maya Voss.

Every project ships with a number attached, not just a screenshot.

See all →

How it works

Four steps. Zero surprises.

We ask the right questions up front and put everything in writing. You always know what’s happening and what it costs.

  1. Discovery

    A free call. You talk, we ask a lot of questions, and we both figure out if this is a fit. No pitch deck, no pressure.

  2. Proposal

    Scope, timeline and price, in writing, before any work starts. The number you see is the number you pay.

  3. Build

    We build in the open. You'll see real pages in your browser within days, not mockups in a deck. Revisions are part of the deal.

  4. Launch

    We ship it, connect your domain and hand you the keys. Keep us around for support, or take the code and run. It's yours either way.

Client results

Don’t take our word for it.

“Delivered exactly what we needed in under a week. We've had noticeably more inquiries since launch.”
Daniel W. · Founder, Logistics
“Turned it around in 48 hours and it looked better than sites we've paid ten times more for.”
Sarah R. · Marketing Director, SaaS
“The automation saves our team 3 hours every day.”
Tom L. · Operations Manager, Ecommerce

20 minutes. Straight talk on scope, timeline and price.

Fair questions

Asked before every project.

Yours isn’t here? That’s literally what the free call is for.

How much does a custom website cost?

Cost depends on scope, but every project gets a fixed quote in writing before any work starts, not an hourly rate. A one-page site runs far less than a multi-page business site or a custom web app, and the free discovery call is what pins down which one you actually need.

How long does a website take to build?

Most projects take one to six weeks depending on what you're building: a landing page is usually live within a week, a multi-page business website takes two to four weeks, and a full web app can take up to six. Your proposal comes with a real date, not a shrug.

Do you use templates or website builders?

No. Everything is designed and coded from scratch around your business. It's why our sites load faster and rank better than template sites, and why yours won't look like anyone else's. You own the code outright.

What happens after launch?

You own everything: domain, code, content. Post-launch fixes are included with every project, and if you'd rather never think about your website again, ongoing support is available.

What does working together look like?

Four steps. A free discovery call about your goals. A written proposal with a fixed scope and quote. The build, with revisions included. Then launch and full handoff. Most projects go from first call to live site in one to four weeks.

Can you fix my existing website instead of rebuilding it?

Sometimes, and we'll be honest about which makes sense. Good bones? A round of targeted fixes might be the smarter spend. Slow template underneath? Rebuilding is usually the better deal in the long run.

Do you handle SEO?

Yes, in two ways: every site ships with the technical basics built in (clean structure, fast loads, structured data, per-page metadata), and if you want to go further, ongoing SEO and AI answer engine optimization is its own service.

Will I actually be talking to you, or to a project manager?

Me. Lee. I lead every engagement personally from the first call through launch, backed by the designers and developers who help me build it. You're never routed through a call center or handed off to someone you've never met.

Start here

Let’s build yours.

Lee Muthu, founder of Muthu Creatives

Talk to Lee

Founder. Your point of contact, start to finish.

The fastest way to find out what your project takes is a free 20-minute call. No sales rep, no pitch deck. If you don’t need us, we’ll tell you that too.

Based in
Houston, TX
Replies within
One business day

Or send the details now

A few answers here and the first call skips straight to the useful part.